Industrial Pump & Valve Solutions
Advanced pumps, valves and integrated control systems for demanding industrial and municipal projects.
- 5-Year Warranty
- ISO 9001 Certified
- 24/7 Support
Our High-Performance Pumps
Pumping Power, Driving Progress -High-Efficiency Pumps for Every Critical Flow.
Our Quality Valves
Precision in Every Turn — Industrial Valves Engineered for Control, Reliability, and Longevity.
Intelligent Control Systems
Precision in Every Turn — Industrial Valves Engineered for Control, Reliability, and Longevity.
Quality Assurance for Industrial Pump & Valve Solutions
Every industrial pump and valve we deliver is backed by a strict quality control system to ensure long-term reliability and performance.
At NORITE, quality is not a single inspection step, but a fully integrated process. From raw material inspection to final performance testing, our pumps, valves and control systems are manufactured and verified under rigorous quality standards to meet demanding industrial and municipal applications.

Incoming Material Inspection
All incoming materials are physically and chemically tested to comply with GB, DIN and ISO standards for industrial pumps and valves.

Process Control
Each production stage — from casting and machining to assembly and coating — is monitored with real-time process control and full traceability.

Pressure & Performance Testing
Every pump and valve undergoes hydrostatic, pneumatic, torque and flow testing to verify performance before delivery.

Final Inspection & Traceable Packaging
Each product is accompanied by a test certificate and serial number to ensure full traceability.

Quality Standards & Certifications for Industrial Equipment
Our factories are certified under ISO 9001, WRAS,ACS,CE standards, and implement 6S management to ensure consistency and efficiency.

Third-Party Inspection & Testing
All NORITE products and orders are subject to inspection by end users and third-party testing agencies.
Pump Knowledge Center
Understanding pump technologies and applications for better decision making




Project Name:The Mlooka Irrigation Project
Location/Country: Mlooka, Malawi
Customer/Owner: Ministry of Agriculture, Malawi
The type of equipment adopted: We supplied all equipment required for the project’s pump stations and water transmission pipelines, including high-efficiency water pumps, valve systems, HDPE pipes, flanges, and fittings. Our products ensure that the entire irrigation network runs smoothly, reliably, and efficiently.
Key indicators: Backed by our strong experience in water infrastructure and well-coordinated supply chain, we customized the delivery schedule and configurations based on site requirements and contractor progress. This helped minimize installation risks and ensured timely project advancement.




Project Name:KHOBI II Hydro Power Project in Georgia
Location/Country: Samegrelo-zemo Svaneti district, Georgia,
Customer/Owner: Ministry of Agriculture, Malawi
Working conditions/Challenges: This hydropower station is the largest one built by Georgia after its independence following the disintegration of the Soviet Union. The annual power generation is approximately 202 million kWh, which can meet the electricity demand of about 50,000 households.
The type of equipment adopted: we provided a complete set of equipment solutions for the project and delivered a full range of valves and accessories including DN2400 hydraulic control butterfly valves, joints, filters, exhaust valves, etc.




Project Name:Ebaps Vila Velha
Location/Country: Espirito Santo State, Brazil
Customer/Owner: “Estacǎo de Bombeamento de Áquas Pluviais
Working conditions/Challenges: This pumping station is a rainwater drainage pumping station. As part of the city ‘s large-scale drainage/flood control infrastructure, it is equipped with approximately 12 kilometers of closed drainage pipe galleries + 7 kilometers of anti-seepage channels.
The type of equipment adopted: We will provide 5 check valves with a diameter of DN1200, 5 matching joints, 3 axial flow pumps with a diameter of dn1400 and a power of 315kw for this project, as well as 11 sets of electric grille equipment, electric gates and flap gates.




Project Name: Kheng Grou Dam
Location/Country: Morocco, Figuig province
Owner:Direction de l’Aménagement Hydraulique (DAH)
The type of equioment adopted:We supplied the dam with products including electric gate valves, hydraulic butterfly valves, detachable couplings, and vent valves. The project is still under construction, and our full-cycle service continues.
Key indicators: This project not only represents an improvement in Morocco’s water infrastructure but also demonstrates our supply capabilities and expertise in large-scale water projects.




Project name:Ribera Sur Programme – Water Supply & Sanitation for Managua, Tipitapa & Ciudad Sandino
Client:ENACAL (Nicaragua)
Project location:Managua city、Tipitapa、Ciudad Sandino in Nicaragua
Project Overview:The project includes the renovation of the municipal water supply system, the construction of sewage pipe networks and sewage treatment plants.
Product range: Tipitapa: 13 Wells, approximately 7.42 km of water transmission trunk lines, 14.08 km of pressure pipelines, 60.53 km of water distribution networks, and 9,928 m³ of water storage tanks.
Supplied products: Pumping station equipment (new Wells + pressurized water), all products of pipelines and water distribution systems, and water storage facilities.




Project Name:Mambu Branco System – Integrated Water Supply Network Expansion
Location/Country: São Paulo Province, Brazil)
Customer/Owner: São Paulo state water and sewage companyWorking
conditions/Challenges: The water resources in this area are tight and the existing water intake capacity is insufficient. New water intake pumping stations and pipeline networks need to be built to ensure reliable water supply. The project includes water intake stations, large pumping stations and 66 km of water supply pipelines.
The type of equipment adopted: Vertical single-stage centrifugal pumps, vertical bipolar centrifugal pumps, horizontal centrifugal pumps
Key indicators:Serving approximately 1.2 million people; The length of the pipeline is approximately 66 km; A combination of multiple pump types.
Achievements/advantages:Improve the problem of water shortage and enhance the reliability of water supply, especially during the peak summer period. The user group has benefited significantly.
Quality You Can Trust
Every Product. Every Process. Every Test.
Certification







Location