Project Name:Water Distribution Network Control System Replacement and Optimization Project in Yopal Municipality
Location / Country:Jopal, Colombia
Project Overview:
The Yopal Water Distribution Network Control System Replacement and Optimization Project is a municipal water infrastructure upgrade project in Colombia, aimed at improving the reliability, efficiency, and operational control of the urban potable water supply network.
NORITE provided a complete range of valve and pipeline solutions, supporting the EPC contractor with technical documentation, product verification, and project approval requirements for the end user.
The type of equipment adopted:
- Gate Valves
- Double Eccentric Butterfly Valves
- Flow Control Valves
- Air Release Valves
- Pipe Fittings
Key indicators:
- Complete valve and pipeline solution for municipal water network optimization.
- Professional technical support including product documents and approval materials for end-user review.
- Factory inspection and supplier evaluation completed successfully by the EPC contractor.
- Reliable flow control solutions designed for long-term operation of water distribution systems.