Water Distribution Network Control System Replacement and Optimization Project in Yopal Municipality

Project Name:Water Distribution Network Control System Replacement and Optimization Project in Yopal Municipality

Location / Country:Jopal, Colombia

Project Overview:

The Yopal Water Distribution Network Control System Replacement and Optimization Project is a municipal water infrastructure upgrade project in Colombia, aimed at improving the reliability, efficiency, and operational control of the urban potable water supply network.

NORITE provided a complete range of valve and pipeline solutions, supporting the EPC contractor with technical documentation, product verification, and project approval requirements for the end user.

The type of equipment adopted: 

  • Gate Valves
  • Double Eccentric Butterfly Valves
  • Flow Control Valves
  • Air Release Valves
  • Pipe Fittings

Key indicators:

  • Complete valve and pipeline solution for municipal water network optimization.
  • Professional technical support including product documents and approval materials for end-user review.
  • Factory inspection and supplier evaluation completed successfully by the EPC contractor.
  • Reliable flow control solutions designed for long-term operation of water distribution systems.