Skip to main content

Noritesoution

Project Name:Valve Maintenance and Replacement Project for Main Irrigation Pipeline at Central Morocco Dam

Location/Country: Morocco

Customer/Owner: Ministry of Agriculture, Maritime Fisheries, Rural Development, Water and Forests, Morocco

The type of equipment adopted: We supplied a comprehensive range of large-diameter core equipment for this project, including:DN1200 Gate Valves、Double Eccentric Butterfly Valves、Silent Check Valves、Slow-Closing Non-Slam Check Valves。All valves were specifically designed and manufactured to withstand high head and high flow conditions, ensuring excellent sealing performance and reliable opening/closing functionality. These products play a vital role in securing the efficiency and stability of the main pipeline system.

Key indicators: Backed by our extensive experience in the waterworks valve sector and our integrated supply chain capabilities, we provided fully customized solutions, tailored to project requirements and delivered on time. Our support enabled the construction team to achieve efficient, high-quality installation.